Photos of House Project

Los Angeles Modern House Project: a house designed with 2 floors, high-standard 20x35 lot. 4 suites with 1 master suite, 3-car garage, and gourmet kitchen

  1. home
  2. Los Angeles
back to the project
Front facade of an imposing modern mansion project, with 555.9m² on a 20x35 lot. Highlights include a 3-car garage, large glass panels, and concrete and wood finishes. Project with 4 suites, office, and gourmet area.Imposing modern house project with detailed facade showing a 3-car garage, double-height glass panels, and landscaping. House with 555.9m² area, 4 suites, on a 20x35 meter lot.Detail of the 3-car garage of the imposing modern house project. Close-up view showing the vehicles, concrete and vegetation detailed flooring, and wood-finished ceiling.Wide front view of the imposing modern house project, showing the facade with a 3-car garage, palm tree landscaping, and lawn. Mansion project with 555.9m² and 4 suites on a 20x35 lot.Night facade of a modern and imposing house project, highlighting the lighting design. Mansion with 555.9m², 4 suites, 3-car garage, on a 20x35 lot. View shows recessed lights and architectural details enhanced at night.Imposing modern mansion project with facade illuminated at dusk. 555.9m² house with 4 suites, 3-car garage, and contemporary design highlighted by artificial lighting.Night detail of the 3-car garage in a modern mansion project. Recessed ceiling lighting in wood enhances the vehicles and design. Imposing house project with 4 suites.Wide night view of the imposing modern house project on a 20x35 lot. Facade with lighting highlighting the 3-car garage, landscaping, and architecture. Mansion with 555.9m² and 4 suites.Interior of the entrance hall of a modern house project. Detail of the wooden pivot door, porcelain tile flooring, staircase with wooden steps, and contemporary decoration with console and plant.Detail of the entrance hall decoration in a modern house project. Console with golden structure, colorful abstract artwork, plant, and wooden door in the background. Contemporary interior design.Interior environment of an imposing modern house project, showing a double-height entrance hall, modern staircase with wooden steps and glass railing, porcelain tile flooring, pivot door, and contemporary decoration.Interior design detail of a modern house, showing a living corner with mid-century style wooden armchairs, colorful circular rug, and decorative plant under the staircase. Naturally lit environment.Large integrated internal space in a modern house project, combining living room, dining room with wooden table, and kitchen/gourmet area with island. Sophisticated interior design, porcelain tile flooring, and modern lighting.Detail of the living room in a modern house project, with a slatted wood and white lacquer TV panel, low rack, sofa, leather armchair, and glass coffee table. Modern and cozy decoration.Living room of a modern house project with large glass windows integrating with the exterior. Contemporary furniture with beige sofa, leather armchairs, TV panel, and view to the dining room in the background.Dining room with wooden table and upholstered chairs in a modern house project. View of the integrated space showing the living room in the background and access to the hall with staircase. Interior design with recessed lighting.Dining room of a modern house project with a wooden table, integrated with the living room with a TV panel and the outdoor area through glass doors. White cabinet/wine cellar in the background.Detail of the gourmet kitchen in a modern house project. Island with countertop for meals, upholstered stools, planned cabinets, suspended shelves, and built-in appliances. Functional and sophisticated design.Perspective of the modern gourmet kitchen in an integrated house project. View of the corridor between the central island and the countertop with planned cabinets and stainless steel appliances. Access to the outdoor area in the background.General view of the integrated social space in a modern house project. Gourmet kitchen with island and cooktop in the foreground, connected to the living room with TV panel in the background. Open concept with contemporary design.Functional pantry with white L-shaped shelves and ceramic flooring, an internal detail of the 555.9m² modern house project.Suite bathroom in a modern house project, featuring a light marble countertop, white rectangular vessel sink, beige lower cabinet, wall niches, and gold-finished fixtures.Angle of the suite bathroom in a modern house project, highlighting the wall-hung toilet, accessories like a gold toilet paper holder and brush, and a contrasting dark wood door.Planned laundry room in a modern house project, equipped with tall and low cabinets in a neutral tone, functional countertop, front-loading washing machine, and access to the outdoor area.Complete laundry room in a modern house project, showing planned cabinets, washing machine, countertop, and a black aluminum sliding door leading to the outdoor service area.Second bathroom detailed in this modern house project, featuring a light countertop with a vessel sink, suspended cabinet with drawers, toilet, and shower stall with glass partition and chrome handle.Interior view of the shower stall in a modern house project bathroom, showing the chrome showerhead, built-in wall niche for products, light porcelain tile cladding, and wooden door.Bedroom design in a modern house project, featuring a single bed, headboard panel and nightstand in wood, and a wardrobe with mirrored sliding doors reflecting the room.Angle of the suite bedroom in a modern house project, highlighting the bed, the wooden panel extending along the wall, the mirrored wardrobe, and the wall-mounted TV.Front view of the TV panel from the bed in a modern house project bedroom, including a decorative shelf, wooden door to the left, and a high window to the right.Pantry or service area with a system of natural wood shelves fixed by metal supports on the wall, optimizing vertical space in this modern house project.Double-height entrance hall in a modern house project, highlighting a floating staircase with wooden steps, metal structure, and glass and stainless steel railing.Office or pantry in a modern house project, with planned upper and lower cabinets, decorative niches, work/support countertop, brick-effect wall cladding, and wooden flooring.Spacious office for two people in a modern house project, with a linear countertop, two brown office chairs, a window with an external view, and decorative pendant lights.Intimate seating area on the mezzanine/upper hall in a modern house project, with a designer armchair and ottoman, side table, glass railing, and large window.Modern beige sideboard with golden metal base in the entrance hall/corridor, complemented by a mirror with LED lighting and a built-in wooden wardrobe, in a house project.Wide view of the office in a modern house project, highlighting the planned cabinets suspended on the side wall, wooden flooring, and the work area in the background.Spacious corridor in a modern house project, with wooden flooring, a decorative sideboard to the left, planned wooden cabinets, and access doors to rooms.Spacious suite in a modern house project, configured with two beds (double and single), continuous wooden headboard panel, mirrored wardrobe, and indirect ceiling lighting.Perspective of the spacious suite in a modern house project, focusing on the wall with a TV panel, suspended rack, wardrobe with mirrored doors, and LED cove lighting.Suite bedroom of a modern house project, showing a planned TV panel in neutral tones, linear recessed lighting in the plaster ceiling, wooden door, and laminate flooring. Part of a house project with 4 suites, 7 bathrooms, and a total area of 555.9m² on a 20x35 lot.Suite bathroom belonging to a modern house project of 555.9m². Details include a countertop with a vessel sink, planned cabinet, mirror, modern pendant light, light porcelain tile wall cladding, glass shower enclosure, and toilet. The house has 7 bathrooms in total.Detail of the bathroom in a modern house project, showing a wooden door, floor-to-ceiling glass shower enclosure with a built-in niche and marbled cladding, modern shower, and towel rack. The bathroom belongs to one of the 4 suites of the 555.9m² house built on a 20x35 lot.Suite bedroom of a 555.9m² modern house project, highlighting a bed with a wooden and light panel headboard with built-in lighting. The wall above the bed has textured wallpaper and artwork, a window with black blinds, and a wardrobe with a sliding door. The property has 4 suites, 7 bathrooms, a gourmet area, and a pool.Angle of the suite bedroom in a modern house project, showing a planned wardrobe with sliding doors, a TV panel with a built-in TV, a bed with a headboard (partially visible), a wooden door, and recessed LED lighting in the ceiling. One of the 4 suites in the 555.9m² house with a gourmet area and pool.Detail of the suite bedroom in a modern house project, displaying a white TV panel with metallic friezes and a decorative shelf. A wooden door, sliding wardrobe, and part of the bed are also visible. The project includes 4 suites, 7 bathrooms, an office, a gourmet area, and a pool on a 20x35 lot.Bathroom of one of the 4 suites in a modern house project. It features a light countertop with a vessel sink, a lower cabinet with a wooden finish, square mirrors, pendant lighting, and marbled porcelain tile cladding. It includes a shower enclosure and toilet. The complete project has 555.9m², 7 bathrooms, an office, and a gourmet area.Close-up of the shower stall in a suite bathroom of a modern house project, highlighting the built-in niche, marbled porcelain tile cladding, rainfall showerhead, and recessed ceiling lighting. The house has 4 suites, 7 bathrooms, a gourmet area, and a pool on a 20x35 lot.Spacious suite bedroom in a modern house project, configured with two single beds, a continuous headboard panel in wood, a mirrored wardrobe, and indirect ceiling lighting.Perspective of the spacious suite in a modern house project, focusing on the wall with a TV panel, suspended rack, wardrobe with mirrored doors, and LED cove lighting.View of the suite bedroom in a modern house project, displaying a TV panel with a shelf, a slatted wood wall integrating a door, air conditioning, and part of a wardrobe with glass doors.Suite bathroom in a modern house project with 4 suites, featuring wooden panel cabinets, a light countertop with a vessel sink, decorative mirrors, and a toilet. Cladding in large-format beige porcelain tiles on the walls. The project totals 555.9m² and includes a pool.Interior view of the shower stall in a modern house project's suite bathroom. Highlighting the built-in niche, marbled porcelain tile cladding, rainfall showerhead, and ceiling lighting. One of the 4 suites in the project which includes 7 bathrooms, a gourmet area, and a pool on a 20x35 lot.Master suite bedroom of a modern house project, with a slatted wood panel on the headboard wall, illuminated by vertical LED strips. Includes a double bed, nightstands, contemporary chandelier, wardrobe with dark doors, and artwork. Part of the 4-suite, 555.9m² project, with an office and pool.Angle of the master suite in a modern house project, displaying a wooden TV panel, countertop with ottomans, and visual access to the organized closet. Details include recessed lighting, chandelier, and part of the bed and slatted headboard panel. Imposing house project with 4 suites, gourmet area, and pool.Master suite in a modern house project, front view of the wooden TV panel with countertop and ottomans. To the right, an integrated closet with a mirrored sliding door reveals internal organization. Large window to the left. One of the 4 suites in the 555.9m² house with a pool and gourmet area.Interior view of the closet in the master suite of a modern house project. Includes a central island with drawers, planned open and closed wardrobes, shoe rack, hanging spaces, and sophisticated lighting with a pendant and recessed LEDs. Belongs to one ofthe 4 suites of the 555.9m² house with a pool and office.Interior of the master suite closet in a modern house project, viewed from the back towards the entrance with a glass sliding door. Includes a central island, planned wardrobes and drawers, shoe rack, hanging spaces, and modern lighting project. Part of the 4-suite house with 555.9m² and a gourmet area.Suite bathroom in a modern house project, displaying a spacious countertop with a vessel sink, planned light lacquer cabinets, a mirror with a frame, and copper/rose gold metal pulls. Recessed LED lighting in the ceiling. One of the 7 bathrooms in the 4-suite, 555.9m² house.Suite bathroom in a modern house project, highlighting Calacatta Gold marble-effect porcelain tile cladding, toilet, shower enclosure with profile and fixtures (hand shower, toilet paper holder) in copper/rose gold tone. Shower niche visible. One of 7 bathrooms in the 4-suite house with a pool.Bathroom design in a modern house project, featuring a suspended cabinet with a wooden slatted panel, white countertop with a vessel sink, a feature wall with chevron pattern cladding, and black fixtures. Modern toilet. Part of the 4-suite project, with a pool and gourmet area.Detail of the bathroom in a modern house project, showing a shower stall with chevron cladding, niche, window, and black fixtures (showerhead, profile). Black heated towel rack and dark door visible. Part of the 4-suite project with a pool and gourmet area on a 20x35 lot.Rear facade of an imposing modern house project, showing integration of the internal social area with the pool through glass doors. Highlights include the pool with a deck, upper balcony with glass railing. House with 555.9m², 4 suites, gourmet area, and 3-car garage.Detail of the pool area in an imposing modern house project. Shows pool, deck, landscaping with vegetation, and part of the house facade. Leisure area belongs to a 555.9m² project with 4 suites and a gourmet area.Outdoor gourmet area/terrace in an imposing modern house project. Highlights include a wooden pergola with suspended vegetation, lounge furniture, glass railing, and a central element (outdoor fireplace or spa). Part of the 555.9m² house with 4 suites and a pool.Lounge space on the gourmet terrace of an imposing modern house project. Features a sofa under a wooden pergola with vegetation, an outdoor fireplace or spa base, and a glass railing. Ideal for relaxation. Part of the 555.9m² house with 4 suites and a pool.Focus on the outdoor fireplace (fire pit) in the gourmet area/terrace of the imposing modern house project. Sunken structure with a place for fire, surrounded by raised seating. Environment with pergola and outdoor furniture. Part of the 555.9m² house with 4 suites and a pool.General view of the rear facade in a modern 4-suite house project. Shows the pool, deck, lounge area with pergola, upper balcony, and integration with the interior. Imposing 555.9m² architecture with gourmet area and 3 garages on a 20x35 lot.
back to the projectsee more about the project

Our house plans are of quality

Did you like our house plans? All of them were conceived with great care and dedication by the team of architects and engineers at Archshop. Keep exploring, because we love having you here.

Archshop
Black Friday

40% off Ready Made Projects 🏠

25% off Custom Projects 📐

VIEW OFFERS
Black Friday
Black Friday
Black Friday
Black Friday